1. |
Dams more than 6 ft high fall under TCEQ jurisdiction and are to comply with TCEQ regulations on dam safety regardless of whether the TCEQ requires a water right for the impoundment. |
|
|
True |
|
|
False |
2. |
A failure would be considered an unintended release of impounded water due to the loss of all or a portion of the dam or affiliated structure. |
|
|
True |
|
|
False |
3. |
All freeboard calculations should include the expected future settlement and consolidation of the embankment after construction in addition to wave run-up. |
|
|
True |
|
|
False |
4. |
The intent of the precipitation analysis is to find the ________________ that would produce the most critical loading on the dam. |
|
|
Critical storm size, |
|
|
Location, |
|
|
Orientation, |
|
|
Duration, |
|
|
All the above |
|
|
None of the above |
5. |
The PMP depths for a particular storm size and range of storm durations are not used to determine the critical storm duration for a dam. |
|
|
True |
|
|
False |
6. |
The Snyder Unit Hydrograph Method and the NRCS Dimensionless Unit Hydrograph Method are the two commonly used precipitation loss methods. |
|
|
True |
|
|
False |
7. |
NRCS Hydrologic Soil Groups and Uniform Infiltration (Loss) Rates are shown in _________. |
|
|
Figure 5.1 |
|
|
Figure 5.2 |
8. |
Typically, two parameters are needed to develop a Snyder Unit Hydrograph and they are _________. |
|
|
TL, lag time & T lead time |
|
|
Cp, shape factor & T lead time |
|
|
Cp, shape factor & TL, lag time |
9. |
How many parameters are used in the NRCS Unit Hydrograph method? |
|
|
One |
|
|
Two |
|
|
Three |
10. |
In models that require routing of the design-storm runoff hydrographs through a stream channel, either a hydrologic or hydraulic routing method may be used. These hydrologic methods are either empirical or semi-empirical. |
|
|
True |
|
|
False |
11. |
Level Pool Routing is the most typically used method for routing a hydrograph through a reservoir in hydrologic models. |
|
|
True |
|
|
False |
12. |
The con in a Kinematic Wave streamflow routing method is that the parameters cannot be estimated from field observations. |
|
|
True |
|
|
False |
13. |
Emergency spillways are generally cut into an abutment and have little or no erosion protection from flows discharging through them. |
|
|
True |
|
|
False |
14. |
______________________ is a hydrologic condition where the inflow hydrograph is equal to the full design flood. |
|
|
Design-flood breach |
|
|
Sunny-day breach |
15. |
The __________________ is determined by the equation (Eq 8.3), which is LU = 0.012 * KS * sq root [ 2*C *H ] |
|
|
Inundation length in miles |
|
|
Total discharge from the breach |
|